NEW COAL DISTRIBUTION POLICY AND COAL SALES
AMENDMENT IN FSAs WITH SPONGE IRON UNITS
![]()
SUBMISSION OF SECURITY DEPOSIT/COMMITMENT GUARANTEE &
CURRENT STATUS OF FSA / LOA
EXECUTION OF FSA/ SUPPLY OF COAL FOR NEW CONSUMERS THROUGH
LOA ROUTE
![]()
UNITS GRANTED LT LINKAGES/ LOAs ISSUED BUT NOT YET STARTED
DRAWING COAL
![]()
ADJUSTMENT OF ACQ DUE TO SHORTFALL IN SECURITY DEPOSIT AS PER FSA![]()
ISSUANCE OF LOA NOTICE LETTERS
![]()
AMENDMENT OF BANK GUARANTESS
TOWARDS SECURITY DEPOSIT UNDER FSA
![]()
AMENDMENT IN FSAs/ SIGNING OF SIDE LETTER BY CEMENT
CONSUMERS
![]()
AMENDMENT IN FSAs WITH SPONGE
IRON UNITS
![]()
ONE TIME EXTENSION OF 15 DAYS FOR
DEPOSITION OF COMMITMENT GUARANTEE FOR LOA
![]()
THREE MODEL FSAs FOR SUPPLY OF COAL
TO NEW CONSUMERS
DRAFT FSA
PRIVATE POWER UTILITIES ![]()
CONCLUDING OF
FSA's BY EXISTING LINKED CONSUMERS OF SECL;LAST & FINAL EXTENSION ![]()
SNAPPED/ SUSPEND LINKAGE CASES
OF ERSTWHILE NON CORE SECTOR CONSUMER
![]()
DETAILS OF COAL SUPPLIES TO POWER UTILITIES FOR FSA
![]()
MONTH OF SUPPLY OF
COAL TO BE PROVIDED BY LOA CONSUMER![]()
MODIFIED SCHEDULE - I
FOR FSA's ![]()
FSA FOR UNITS HAVING REGULARIZATION/RESTORATION OF LINKAGE
![]()
VALIDITY
PERIOD OF BANK GUARANTEE TOWARDS SECURITY DEPOSIT FOR FSA's
![]()
PROCEDURE FOR SIGNING THE FSAs WITH STATE NOMINATED AGENCIES [ NEW ]
PROCEDURE FOR ISSUANCE OF LOA [ NEW ]
PROCEDURE FOR SIGNING THE FSAs WITH- EXISTING VALID LINKED CONSUMERS [ NEW ]
LETTER OF ASSURANCE FORMATS FOR DIFFERENT SECTORS [NEW]
FUEL SUPPLY AGREEMENT NOTICE FOR EXISTING CONSUMERS [ NEW ]
MODEL FUEL SUPPLY AGREEMENTS [NEW]
COAL AVAILABILITY SCENARIO[ NEW ]
COAL PRICE NOTIFICATION DATE 12/12/2007[ NEW ]
NEW COAL DISTRIBUTION POLICY FROM MINISTRY OF COAL,GOVERNMENT OF INDIA [CLICK TO DOWNLOAD]
CONSUMER WISE DESPATCHES AND MEASURES FOR CUSTOMER SATISFACTION
To ensure accurate weighment of coal being despatched all 23 railway sidings/captive sidings and 36 weigh bridges have been equipped with with electronic printout facility.
90 Road weigh bridges are in operation.
Feeder breakers and crushers installed to ensure 100% sizing of coal for supply to power houses.
SECTOR WISE DESPATCHES (MT) as on 2006-2007
| SECTOR | 2003-04 | 2004-05 | 2005-06 | percentage increase (05-06) | 2006-07 |
Power House |
57.49 | 60.98 | 62.08 | 1.54% | 61.52 |
| CPP Unit | 2.62 | 2.92 | 3.98 | 35.84% | 5.81 |
Steel (Blendable) |
0.15 | 0.15 | 0.15 | 0.00% | 0.16 |
| Steel (Non Blendable) | 0.53 | 0.56 | 0.53 | -3.64% | 0.53 |
| Steel -Total | 0.68 | 0.71 | 0.68 | -2.87% | 0.69 |
| Sponge | 2.76 | 3.47 | 3.85 | 4.05% | 4.28 |
Cement |
6.35 | 7.25 | 7.20 | -0.41% | 6.94 |
Fertilizer |
0.37 | 0.55 | 0.64 | 8.47% | 0.73 |
Others |
3.22 | 2.88 | 2.73 | 10.53% | 6.18 |
| Total | 70.87 | 78.76 | 81.16 | 3.05% | 86.15 |
FIELDS WISE WAGON LOADING POSITION ( 2006-07)
| FIELD | LOADING (FIG. IN FWW) | |||
| 2003-04 | 2004-05 | 2005-06 | 2006-07 | |
| 1- KOREA-REWA | 2219 | 2292 | 2324 | 2301 |
| 2- KORBA | 1960 | 2161 | 3122 | 2330 |
| TOTAL | 4179 | 4453 | 5446 | 4631 |
WEIGHMENT & SIZING OF COAL DESPATCHED (2006-07)
YEAR |
% WEIGHED |
% SIZED (CHP/CR/FB/UG SHARE) |
| 2002-03 | 98.80 | 96.59 |
| 2003-04 | 97.91 | 96.83 * |
| 2004-05 | 99.68 | 96.50 |
| 2005-06 | 99.81 | 96.41 |
| 2006-07 | 99.42 | 95.65 |
* Excluding dozer/manual means
COAL DESPATCHES TO POWERHOUSES (2006-07) = 61. 52 MT
POWER HOUSES |
IN MT |
|
1 |
NTPC |
11.70 |
2 |
MPEB |
5.18 |
3 |
BSES |
2.45 |
4 |
TORREN POWER |
1.34 |
5 |
GEB |
14.79 |
6 |
MSEB |
4.76 |
7 |
RVUNL |
11.32 |
| 8 | PSEB | 1.91 |
| 9 | KPCL | 0.28 |
| 10 | RAMAGUNDAM | 0.59 |
| 11 | CSEB | 7.20 |
TOTAL |
61.52 |
ACTION TAKEN BY SECL TO MINIMISE COMPLAINTS
- Continous monitoring of coal dispatches is being done to ensure all required precautionary measures are being taken at area level to improve coal quality
- Regular and surprise inspection done by Quality control dept team to defaulting mines/sidings/areas to minimize complaints
- Establishment of complaint redressal system at head quarter level with regular feedback to consumers of corrective action taken by the concerned area enabling quick disposal of complaints lodged.
About Quality
Assessment of quality is being done through
About Quantity
All the Sidings provided with Weighbridges with electronic print out facility.
Representatives of SEBs and other consumers are encouraged to supervise weighment.
Print out of all such weighment being submitted along with the coal bills.
Representatives of SEBs and other consumers are encouraged to put their remarks in Joint Inspection Registers kept at all the Sidings for the purpose.
![]()
Copyright © South Eastern
Coalfields Limited
SECL Bhawan, Seepat Road,
Post Box No. 60, Bilaspur
Pin - 495001(Chattisgarh)