NEW COAL DISTRIBUTION POLICY AND COAL SALES

AMENDMENT IN FSAs WITH SPONGE IRON UNITS

SUBMISSION OF SECURITY DEPOSIT/COMMITMENT GUARANTEE & CURRENT STATUS OF FSA / LOA  

EXECUTION OF FSA/ SUPPLY OF COAL FOR NEW CONSUMERS THROUGH LOA ROUTE

UNITS GRANTED LT LINKAGES/ LOAs ISSUED BUT NOT YET STARTED DRAWING COAL

ADJUSTMENT OF ACQ DUE TO SHORTFALL IN SECURITY DEPOSIT AS PER FSA

ISSUANCE OF LOA NOTICE LETTERS

AMENDMENT OF BANK GUARANTESS TOWARDS SECURITY DEPOSIT UNDER FSA 

AMENDMENT IN FSAs/ SIGNING OF SIDE LETTER BY CEMENT CONSUMERS

AMENDMENT IN FSAs WITH SPONGE IRON UNITS 

ONE TIME EXTENSION OF 15 DAYS FOR DEPOSITION OF COMMITMENT GUARANTEE FOR LOA

THREE MODEL FSAs FOR SUPPLY OF COAL TO NEW CONSUMERS

DRAFT FSA  PRIVATE POWER UTILITIES   

CONCLUDING OF FSA's BY EXISTING LINKED CONSUMERS OF SECL;LAST & FINAL EXTENSION

SNAPPED/ SUSPEND LINKAGE CASES OF ERSTWHILE NON CORE SECTOR CONSUMER 

DETAILS OF COAL SUPPLIES TO POWER UTILITIES FOR FSA

MONTH OF SUPPLY OF COAL TO BE PROVIDED BY LOA CONSUMER

MODIFIED SCHEDULE - I FOR FSA's   

FSA FOR UNITS HAVING REGULARIZATION/RESTORATION OF LINKAGE 

VALIDITY PERIOD OF BANK GUARANTEE TOWARDS SECURITY DEPOSIT FOR FSA's

PROCEDURE FOR SIGNING THE FSAs WITH STATE NOMINATED AGENCIES   [ NEW ]

PROCEDURE FOR ISSUANCE OF LOA   [ NEW ]

PROCEDURE FOR SIGNING THE FSAs WITH- EXISTING VALID LINKED CONSUMERS   [ NEW ]

LETTER OF ASSURANCE FORMATS FOR DIFFERENT SECTORS [NEW]

FUEL SUPPLY AGREEMENT NOTICE FOR EXISTING CONSUMERS [ NEW ]

MODEL FUEL SUPPLY AGREEMENTS   [NEW]

COAL AVAILABILITY SCENARIO[ NEW ]

COAL PRICE NOTIFICATION DATE 12/12/2007[ NEW ]

NEW COAL DISTRIBUTION POLICY FROM MINISTRY OF COAL,GOVERNMENT OF INDIA [CLICK TO DOWNLOAD]

 

CONSUMER WISE DESPATCHES AND MEASURES FOR CUSTOMER SATISFACTION

SECTOR WISE  DESPATCHES  (MT) as on 2006-2007

SECTOR 2003-04 2004-05 2005-06 percentage increase (05-06) 2006-07

Power House

57.49 60.98 62.08 1.54% 61.52
CPP Unit 2.62 2.92 3.98 35.84% 5.81

Steel (Blendable)

0.15 0.15 0.15 0.00% 0.16
Steel (Non Blendable) 0.53 0.56 0.53 -3.64% 0.53
Steel -Total 0.68 0.71 0.68 -2.87% 0.69
Sponge 2.76 3.47 3.85 4.05% 4.28

Cement

6.35 7.25 7.20 -0.41% 6.94

Fertilizer

0.37 0.55 0.64 8.47% 0.73

Others

3.22 2.88 2.73 10.53% 6.18
Total 70.87 78.76 81.16 3.05% 86.15

FIELDS WISE WAGON LOADING POSITION  ( 2006-07)

FIELD LOADING (FIG. IN FWW)
2003-04 2004-05 2005-06 2006-07                        
1- KOREA-REWA 2219 2292 2324 2301
2- KORBA 1960 2161 3122 2330
TOTAL 4179 4453 5446 4631

WEIGHMENT & SIZING OF COAL DESPATCHED (2006-07)

YEAR

% WEIGHED

% SIZED (CHP/CR/FB/UG SHARE)

2002-03 98.80 96.59
2003-04 97.91   96.83 *
2004-05 99.68 96.50
2005-06 99.81 96.41
2006-07 99.42 95.65

                * Excluding dozer/manual means

COAL DESPATCHES TO POWERHOUSES (2006-07) = 61. 52  MT

 

POWER HOUSES

IN MT

1

NTPC

11.70

2

MPEB

5.18

3

BSES

2.45

4

TORREN POWER

1.34

5

GEB

14.79

6

MSEB

4.76

7

RVUNL

11.32
8 PSEB 1.91
9 KPCL 0.28
10 RAMAGUNDAM 0.59
11 CSEB 7.20
 

TOTAL

61.52

ACTION TAKEN BY SECL TO MINIMISE COMPLAINTS

About Quality

Assessment of quality is being done through –

About  Quantity

 

line.gif (2998 bytes)

Copyright © South Eastern Coalfields Limited
SECL Bhawan, Seepat Road,

Post Box No. 60, Bilaspur
Pin - 495001(Chattisgarh)